Item 79418 - Mt. Zircon Resevoir construction, Rumford, 1914

Item 79418 - Mt. Zircon Resevoir construction, Rumford, 1914
Contributed by Greater Rumford Area Historical Society
Item 79418
Mt. Zircon Resevoir construction, Rumford, 1914
Zoom
4471px x 3131px - 14.9"w x 10.4"h @ 300dpi  |  Need a larger size?
*Credit line must read: Collections of Greater Rumford Area Historical Society
Image Info

A crew is in the process of constructing an approximately 100-foot long bridge from the top of the dam to the gatehouse at the Mt. Zircon Resevoir in Rumford. The impact of winter’s ice on the gatehouse was one of a number of special considerations addressed in a report by Sawyer & Moulton, a Boston engineering firm that was consulted on resevoir operations.

Show Details