Item 73126 - Water District work, Sebago Lake, 1924
- Item 73126 - Water District work, Sebago Lake, 1924
- Contributed by Maine Historical Society/MaineToday Media
- Item 73126
- Zoom
- 4377px x 3387px - 14.6"w x 11.3"h @ 300dpi | Need a larger size?
- *Credit line must read: Collections of Maine Historical Society/MaineToday Media
-
Image Info This photo was taken during Portland Water District's construction of the new intake and conduit from Sebago Lake and appeared in the Portland Evening Express & Advertiser on December 9, 1924.
Show Details
The men pictured, from left, are James J. Renchan, superintendent of the tunnel job; Harry U. Fuller, chief engineer of the Portland Water District; Charles B. Mitchell, resident engineer, and M. R. Kirkpatrick, core-drill expert.
The original gate and screen house, built in 1869 by the Portland Water Company, had been in use for 55 years but were not low enough to provide water to Portland in the event of another great fire. To remedy this, a new intake house was built with water entering 20 feet below the surface and then through five sets of double screens into the main pipe line, 45 feet below the surface.
The success of the construction of tunnels so far below the surface was dependent upon this team of experts.