Item 35578 - Carlton Bridge, Bath, ca. 1930

Item 35578 - Carlton Bridge, Bath, ca. 1930
Contributed by Maine Historical Society
Item 35578
Carlton Bridge, Bath, ca. 1930
Zoom
4895px x 3136px - 16.3"w x 10.5"h @ 300dpi  |  Need a larger size?
*Credit line must read: Collections of Maine Historical Society
Image Info

The Carlton Bridge across the Kennebec River between Bath and Woolwich was completed in 425 days, cost $3,000,000 and opened on November 15, 1927.

It was built with two decks, the lower for a single railroad track for the Maine Central Railroad, and the upper deck with a roadway for cars and trucks and two sidewalks.

Show Details